Pequonnock River Trail at Trumbull Center

Project Description

The Town of Trumbull Engineering Department is currently working on improvements to the Pequonnock River Trail

Work will continue until the end of 2020 (weather permitting). Various sections of the road will be closed to through traffic at different times throughout this process. The Town of Trumbull will endeavor to keep disturbance to a minimum.  However, your patience will be much appreciated.  Construction work is anticipated to start at 7:00 AM daily.  All bus stops will remain at their current locations.

Road Work Sign (JPG)

Project Progress

The Town will post updates to this website and include the anticipated two week look ahead for the project. Dates and locations are subject to change if unforeseen factors arise. Colonna Concrete & Asphalt Paving  is the contractor working for the Town on the Pequonnock River Trail Crossing.

10/26/20 2 week Look ahead

  • Final grading and paving from Pequonnock Road to Veterans Memorial park.
  • Clearing & grubbing, installation of drainage and curbing at the Tait Road trail parking.
  • Form & pour sidewalk at the Fire Station

9/28/2020: 2 Week Look Ahead


Grading sidewalk to continue in preparation for paving. Tait Road Parking Lot Improvements Construction Update.