10/9/15 - 2 Week Look-Ahead for the Town of Trumbull’s Paving Program
At this time, below is the anticipated 2 week look ahead for The Town of Trumbull’s Paving schedule. Dates and locations are subject to change based on numerous unforeseen factors. The Town of Trumbull shall provide an update on a weekly basis.
Various sections of the roads will be closed to “Thru Traffic” at different times throughout this process. The Town of Trumbull Road will endeavor to keep disturbance to a minimum. However, your patience will be much appreciated. Construction work is anticipated to start at 7:00 am daily.
All roads will be open to School Bus traffic at all times. Bus stops will remain in their designated locations.
Week of October 12th, 2015 & Week of October 19th, 2015
1) Roadway grading will continue on Blackhouse Road.
2) Installation of first layer of Asphalt will begin Blackhouse Road on or about 10/14/15.
3) Curbing installation and topsoil/seed will continue on Coventry Lane on or about 10/13/15.
4) Installation of second layer of asphalt will continue on Chalon and Cold Spring Drive.