Frequently Asked Questions
Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
Public Works - Sewers / Water Pollution Control Authority (WPCA)
3-
Public Works - Sewers / Water Pollution Control Authority (WPCA)
Unit Charged
The residential Water Pollution Control Authority (WPCA) User Rate per Centum Cubic Feet (CCF) for Fiscal 2025-2026 is $6.715 A single fixed residential Unit Charge of $34.000 per quarter is billed every resident with access to the sewer system. Residents not connected are not exempt from this cost.
Measuring Consumption
The number of CCFs each dwelling generates is determined by the amount of water coming into the house. That consumption is measured by their water meters and billed quarterly. The consumption plus the Unit Charge determines the total sewer user bill.
Example: Water consumption of 21 CCF multiplied $6.715 equals $141.015 plus the Unit Charge $34.00 equals $175.015 for the quarter.
Estimated Cost
The estimated cost to Bridgeport for Sewage Treatment: $7,738,760 is based on an estimated consumption of 1,100,000 CCF.
Sewer Service Breakdown
Approximately 65% of the Town of Trumbull has sanitary sewer service.
-
Public Works - Sewers / Water Pollution Control Authority (WPCA)
The most recent sewer expansion project was in North Nichols. It was labeled Phase IV - Part B. Contract IV. It will provided sewer service to 862 residents. The assessments were determined by the actual construction, engineering and administrative costs for this project. The amount assessed is payable over 20 years at an interest rate of 2.75%.
-
Public Works - Sewers / Water Pollution Control Authority (WPCA)
For a list of registered sewer installers, please visit the Sewer/Water Pollution Control Authority (WPCA) page.