Strobel Road Construction

Project Description

The Town of Trumbull Engineering Department is currently working on a Roadway Reconstruction of Strobel Road (from Daniels Farm Road to Booth Hill Road). 

The scope of work will include intersection improvements at Daniels Farm Road, culvert improvements, roadway re-alignment, full depth roadway reconstruction and drainage improvements, etc.

This is a long-term project that will require multiple years to complete (weather dependent). Location of work along Strobel Road will be updated as the project progresses. Various sections of the road will be closed to through traffic at different times throughout this process.  The Town of Trumbull will endeavor to keep disturbance to a minimum.  However, your patience will be much appreciated. Construction work is anticipated to start at 7:00 AM daily.  All bus stops will remain at their current locations.

The State of Connecticut will provide 100% of the construction costs and the Town of Trumbull was only required to fund the design of the project.

Road Work Sign (JPG)

Project Progress

The Town will post updates to this website and include the anticipated two week look ahead for the project. Dates and locations are subject to change if unforeseen factors arise. Colonna Concrete & Asphalt Paving LLC is the contractor working for the Town on the Strobel Road Reconstruction project.

2/3/2021: 2 Week Look Ahead


Due to current weather conditions, there will be no construction activity on Strobel Road. Work is scheduled to continue the week of February 15th, 2021 if conditions allow. Updates will be continuously posted on the Town of Trumbull's website.

1/7/2021: 2 Week Look Ahead


Construction on Strobel Road will continue in January while the weather conditions are suitable to work in. The majority of construction activity will be within the road shoulder during this period of time unless otherwise notified.


Week of January 11th, 2021:

  • Backfilling of curbing and grading of road shoulders
  • Guardrail installation
  • Permanent signage installation
  • Construct concrete wall caps, install wall stone facing on concrete walls

Week of January 18th, 2021:

  • Continuation of the task listed above

11/30/2020: 2 Week Look Ahead


On Monday, November 30th until Wednesday, December 2nd, 2020, Strobel Road will be closed between Chatham Drive and Gray Rock Road beginning at 7:00am to 5:00pm for paving of this section. The detour will be in place.  School buses and emergency vehicles will be able to pass through.


Week of November 30th, 2020:

  • Paving of binder course at Strobel Culvert
  • Installation of remaining curbing
  • Paving of top course starting at Chatham Drive
  • Backfill of curbing and paving of driveways
  • Continue installation of wall facing on concrete walls

Week of December 7th, 2020:

  • Continue paving of top course to Booth Hill Road

11/6/2020: 2 Week Look Ahead


On Thursday, November 5th through Tuesday, November 10th, 2020, Strobel Road will be closed between Chatham Drive and Gray Rock Road but will remain open on the weekend. The detour will be active from 8:00am to 5:00pm for paving of this section. School busses and emergency vehicles will be able to pass through


Week of November 9th, 2020:

  • Continue paving binder course to Gray Rock Road
  • Install all remaining curbing on Strobel Road from Chatham Drive to Booth Hill Road
  • Install new permanent signage on Daniels Farm Road and Strobel Road up to Chatham Drive
  • Install permanent line striping on Strobel Road up to Chatham Drive
  • Begin installation of stone facing on concrete wall

Week of November 16th, 2020:

  • Backfill of all curbing
  • Continue installation of wall facing on concrete walls
  • Install concrete sidewalk at culverts
  • Set all manholes and catch basins to final paving grade

10/26/2020: 2 Week Look Ahead


Week of October 26th, 2020:

  • On Monday, 10/26/20, one lane will be closed with alternating traffic between Hemlock Trail and Shelter Rock Rd
  • Final grading & binder course paving between Chatham Dr to Gray Rock Rd. Detour will be in place
  • Traffic signal to be activated on Tuesday, 10/27/20
  • Installation of wall-stone facing on concrete walls
  • Signage installation
  • On Saturday 10/31/20, the section between Chatham Road and Gray Rock Road will be closed and detouring will be in place

Week of November 2nd, 2020:

  • Binder Course paving, curb installation
  • Installation of wall-stone facing on concrete walls

10/09/2020: 2 Week Look Ahead

Week of October 12th, 2020:

  • Finalize Strobel Road rough grades from Doe Hollow Drive to Gray Rock Road
  • Raise drainage basins and manholes to match pavement grades
  • Traffic signal to be activated (date of activation to be determined)

Week of October 19th, 2020:

  • Final grading of all remaining sections
  • Begin installation of wall-stone facing on concrete walls

9/28/2020: 2 Week Look Ahead

Week of 9/28/20:

  • Continue to excavate to establish new road grades

Week of 10/5/20:

  • Reclaim final section of Strobel Road
  • Move material to establish new road grades
  • Begin installation of wall-stone facing on concrete walls

9/14/2020: 2 Week Look Ahead

The traffic signal has been removed at the Strobel Culvert and two-way traffic is currently restored.

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of September 14th, 2020:

  • Form wingwall and parapet wall on North side of the culvert
  • Install drainage at Shelter Rock Road

Week of September 21st, 2020:

  • Establish natural channel in culvert and streambed
  • Continue reclaiming portions of Strobel Road
  • Begin excavation in cut sections

8/31/2020: 2 Week Look Ahead


Strobel Road between Chatham Drive and Gray Rock Road will be closed from 9:00 AM to 12:00 PM on Monday, August 31, 2020, for the removal of the two-way traffic signal. Two way traffic will be restored at the culvert location within the week

Strobel Road between Daniels Farm Road and Chatham Drive will be closed from 6:00 AM to 5:00 PM on Tuesday, September 1 and Wednesday, September 2, 2020 for the final paving of this section of Strobel Road.  Detours will be in place and the road will be put back together by the end of each workday.

Detour Map

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of August 31st, 2020:

  • Paving of Strobel Road between Daniels Farm Road and Chatham Drive
  • Removal of two way traffic signal and reconfigure traffic pattern over culvert
  • Backfill curbing and install loam and seed on Strobel Road

Week of September 7th, 2020:

  • Continue installing fill behind curbs and seeding
  • Continue pavement repairs and handwork

8/19/2020: 2 Week Look Ahead


Strobel Road between Chatham Drive and Gray Rock Road will be closed from 6:00 AM to 5:00 PM on Friday, August 21, 2020, for application of waterproofing membrane on top of new box culverts

Detours will be in place.  The road will be put back together by the end of the day, including temporary paving.

Detour Map

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of August 17th, 2020:

  • Install drainage at culvert, located at Shelter Rock Road
  • Line striping of Daniels Farm Road
  • Pouring of parapet wall and forming wingwall on South side of culvert
  • Backfill curbing and install loam and seed on Strobel Road from Daniels farm Road to Chatham Drive

Week of August 24th, 2020:

  • Establish natural channel at culvert and streambed
  • Pave top course of roadway from Daniels Farm Road to Chatham Drive
  • Begin reclaiming remaining section from Daniels Farm Road to Shelter Rock Road
  • Remove temporary signal and re-establish two way traffic at culvert

7/31/2020: 2 Week Look Ahead

As of July 13th, 2020, the temporary traffic signal will be in place and operating at the Strobel Road culvert located between Doe Hollow Drive and Hemlock Trail. Alternating one way traffic will be used for the duration of the culvert repairs, which is anticipated to be complete the 1st week of September, 2020. 

On July 31st and August 3rd, the phase 2 detour from Gray Rock Road to Chatham Drive will be used between the hours of 7:00am and 5:00pm:

Detour Map

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of August 3rd, 2020:

  • Establish new traffic pattern for the North lane at the Stobel Culvert in preparation to switch alternating traffic lanes
  • Install remaining box culvert units on south side of culvert
  • Install poured concrete footings and cutoff walls on south side of culvert

Week of August 10th, 2020:

  • Begin construction of culvert parapet and wing walls on the south side of roadway

7/17/2020: 2 Week Look Ahead

As of July 13th, 2020, the temporary traffic signal will be in place and operating at the Strobel Road culvert located between Doe Hollow Drive and Hemlock Trail. Alternating one way traffic will be used for the duration of the culvert repairs, which is anticipated to be complete the 1st week of September, 2020. 

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of July 20th, 2020:

  • Continue repairs to culvert
  • Lowering of watermain, east side of culvert

Week of July 27th, 2020:

  • Continue repairs to culvert
  • Lowering of watermain, west of culvert

7/2/2020: 2 Week Look Ahead

The temporary traffic signal at the Strobel Road culvert (between Doe Hollow Drive and Hemlock Trail) is being installed on July 13, 2020.

The temporary traffic signal at the Strobel Road culvert is being installed between Doe Hollow Drive and Hemlock Trail. The alternating one way traffic will be in place and operational by the end of the day today, 7/13/2020. The Contractor will also begin working on the culvert. It is anticipated that two-way traffic will resume the 1st week of September, 2020.

Starting the week of July 6th, 2020, alternating traffic lanes will be used on Strobel Road at the location of the Booth Hill Brook Culvert.

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of July 6thth, 2020:

  • Setup and implement alternating one way traffic at culvert with additional signage and safety barriers
  • Begin demolition and removal of existing culvert (east side)
  • Site preparation on north side of roadway for crane setup

Week of July 13th, 2020:

  • Setup crane on north side of roadway 
  • Continue culvert repairs

6/12/2020: 2 Week Look Ahead

Starting on May 12th, 2020, alternating traffic lanes will be used when possible on Strobel Road and Daniels Farm Road if paving conditions allow.

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of June 15th, 2020:

  • Set manholes and catch basins to grade
  • Excavation and removal of materials within roadway for full depth reconstruction
  • Establishing of rough grade within road way 

Week of June 22nd, 2020:

  • Set manholes and catch basins to grade
  • Continue grading to establish final grade

5/11/2020: 2 Week Look Ahead

Starting on May 12th, 2020, alternating traffic lanes will be used when possible on Strobel Road and Daniels Farm Road if paving conditions allow. The Phase 3 Detour from Chatham Drive to Daniels Farm Road will be used at all other times.

Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of May 11th, 2020:

  • Paving binder course on Strobel Road beginning at Chatham Drive towards Daniels Farm Road
  • Paving binder course on Daniels Farm Road
  • Installation of curbing on Strobel Road and Daniels Farm Road

Week of May 18th, 2020:

  • Paving final top course on Daniels Farm Road
  • Continue installation of curbing on Strobel Road and Daniels Farm Road

3/27/2020: 2 Week Look Ahead

Alternating traffic lanes will be used along various sections on Daniels Farm road and Strobel Road untill further notice. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of March 30th, 2020:

  • Continue installing storm drainage on Daniels Farm Road
  • Install electric conduit, traffic foundations and handholes at the intersection of Daniels Farm Road and Strobel Road
  • Replace asphalt sidewalk on Strobel Road along school property

Week of April 6th, 2020:

  • Install pavement edge drainage and water stop on Daniels Farm Road
  • Temporary pavement and maintenance of roadways

2/28/2020: 2 Week Look Ahead

Starting on February 4th, 2020, alternating traffic lanes will be used on Daniels Farm road until the installation of drainage is complete. Work is scheduled to occur while school is in session to avoid conflict with bus routes and times of heavy traffic.

Alternating traffic will be used along various sections of Strobel Road until further notice. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of March 2nd, 2020:

  • Excavation and grading in preparation for retaining walls
  • Installation of retaining walls along Strobel Road near Doe Hollow Drive
  • Installation of retaining walls along Strobel Road near Gray Rock Road

Week of March 9th, 2020:

  • Excavation and grading in preparation for retaining wall
  • Installation of retaining walls along Strobel Road near Doe Hollow Drive
  • Installation of retaining walls along Strobel Road near Gray Rock Road


2/14/2020: 2 Week Look Ahead

Starting on February 4th, 2020, alternating traffic lanes will be used on Daniels Farm road until the installation of drainage is complete. Work is scheduled to occur while school is in session to avoid conflict with bus routes and times of heavy traffic.

Alternating traffic will be used along various sections of Strobel Road until further notice. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of February 17th, 2020:

  • Installation of catch basins and drainage pipes on Daniels Farm Road located South of Marigold Lane
  • Excavation and grading in preparation for retaining walls
  • Installation of retaining walls along Strobel Road near Doe Hollow Drive

Week of February 24th, 2020:

  • Installation of catch basins and drainage pipes on Daniels Farm Road located South of Marigold Lane
  • Excavation and grading in preparation for retaining wall
  • Installation of retaining walls along Strobel Road near Doe Hollow Drive

1/31/2020: 2 Week Look Ahead

Starting on February 4th, 2020, alternating traffic lanes will be used on Daniels Farm road until the installation of drainage is complete. Work is scheduled to occur while school is in session to avoid conflict with bus routes and times of heavy traffic.

The Phase 1 detour from Booth Hill Road to Gray Rock Road will be active until further notice. Alternating traffic will be used along various sections of Strobel Road and Daniels Farm Road. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.


Week of February 3rd, 2020:

  • Phase 1 Detour from Booth Hill Road to Gray Rock Road will be active
  • Installation of catch basins and drainage pipes on Daniels Farm Road located South of Marigold Lane
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Continue to form and pour concrete for retaining walls

Week of February 10th, 2020:

  • Excavation to establish rough grades for retaining wall
  • Begin forming and pouring footings for retaining wall located between Doe Hollow Drive and Hemlock Trail

1/17/2020: 2 Week Look Ahead

Starting on January 13th, 2020, the Phase 1 detour from Booth Hill Road to Gray Rock Road will be active until further notice. Alternating traffic will be used along various sections of Strobel Road and Daniels Farm Road. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

The tree removal to occur between Booth Hill Road and Gray Rock Road will require the use of large equipment and will obstruct the majority of the roadway. Please be aware that if your residence is within this section that is being detoured, you may be required to enter through the opposite side. Access will be limited until the remaining trees have been removed from this area. 

Week of January 20th, 2020:

  • Phase 1 Detour from Booth Hill Road to Gray Rock Road will be active
  • Tree removal within the area approaching Pinewood Trail
  • Installation of miscellaneous drainage at the Strobel and Daniels Farm Road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall

Week of January 27th, 2020:

  • Installation of miscellaneous drainage at the Strobel and Daniels Farm road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall
  • Tree removal from Chatham Drive to Gray Rock Road

1/10/2020: 2 Week Look Ahead

Starting on January 13th, 2020, the Phase 1 detour from Booth Hill Road to Gray Rock Road will be active until further notice. Alternating traffic will be used along various sections of Strobel Road and Daniels Farm Road. Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of January 13th, 2020:

  • Phase 1 Detour from Booth Hill Road to Gray Rock Road will be active
  • Tree removal from Booth Hill Road to Gray Rock Road
  • Installation of miscellaneous drainage at the Strobel and Daniels Farm Road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall

Week of January 20th, 2020:

  • Installation of miscellaneous drainage at the Strobel and Daniels Farm road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall
  • Tree removal from Chatham Drive to Gray Rock Road

1/3/2020: 2 Week Look Ahead

Starting on January 6, 2020, the contractor will begin working on Strobel Road and the Phase 2 detour from Chatham Drive to Gray Rock Road will be active.  Details on the location and type of work will be continuously updated and posted to the Town of Trumbull’s website.

Week of January 6th, 2020:

  • Installation of miscellaneous drainage at the Strobel and Daniels Farm road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall
  • Tree removal from Chatham Drive to Gray Rock Road

Week of January 13th, 2020:

  • Installation of miscellaneous drainage at the Strobel and Daniels Farm road intersection
  • Rock excavation of hillsides, primarily in the area of Strobel Road opposite of Pinewood Trail
  • Excavation to establish rough grades for retaining wall
  • Tree removal from Chatham Drive to Gray Rock Road

12/20/2019: 2 Week Look Ahead

Starting on December 23, 2019, the contractor will be stopping work on Strobel Road. Dependent on weather conditions we are expecting to continue work in January of 2020. The Phase 2 detour from Chatham Drive to Gray Rock Road will not be active until the contractor returns. An update will be posted on the Town of Trumbull website prior to the detour being re-activated.

Week of December 23rd, 2019:

  • No work scheduled for winter shutdown

Week of December 30th , 2019:

  • No work scheduled for winter shutdown

12/13/2019:2 Week Look Ahead

Starting on November 18, 2019, the contractor will begin work between Chatham Drive and Daniels Farm Road. This work will be limited to drainage improvements within or close to the roadway shoulder. 2-lane traffic will be maintained at all times. Current Phase 2 detour from Chatham Drive to Gray Rock Road will remain active until further notice.

Detour Map: ACTIVE Strobel Road Detour Plans-Chatham Dr to Gray Rock Rd Work Zones (PDF)

Week of December 16th, 2019:

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

Week of December 23rd , 2019:

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

12/06/19: 2 Week Look Ahead

Starting on November 18, 2019, the contractor will begin work between Chatham Drive and Daniels Farm Road. This work will be limited to drainage improvements within or close to the roadway shoulder. 2-lane traffic will be maintained at all times. Current Phase 2 detour from Chatham Drive to Gray Rock Road will remain active until further notice.

Detour Map: ACTIVE Strobel Road Detour Plans-Chatham Dr to Gray Rock Rd Work Zones (PDF)

Week of December 9th , 2019:

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue 

Week of December 16th , 2019:

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

11/27/19: 2 Week Look Ahead

Starting on November 18, 2019, the contractor will begin work between Chatham Drive and Daniels Farm Road. This work will be limited to drainage improvements within or close to the roadway shoulder. 2-lane traffic will be maintained at all times. Current Phase 2 detour from Chatham Drive to Gray Rock Road will remain active until further notice.

Detour Map: ACTIVE Strobel Road Detour Plans-Chatham Dr to Gray Rock Rd Work Zones (PDF)

Week of December 2nd , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

Week of December 9th , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue


11/22/19: 2 Week Look Ahead

Starting on November 18, 2019, the contractor will begin work between Chatham Drive and Daniels Farm Road. This work will be limited to drainage improvements within or close to the roadway shoulder. 2-lane traffic will be maintained at all times. Current Phase 2 detour from Chatham Drive to Gray Rock Road will remain active until further notice.

Week of November 25th , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

Week of December 2nd , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

11/15/19: 2 Week Look Ahead

Starting on November 18, 2019, the contractor will begin work between Chatham Drive and Daniels Farm Road. This work will be limited to drainage improvements within or close to the roadway shoulder. 2-lane traffic will be maintained at all times. Current Phase 2 detour from Chatham Drive to Gray Rock Road will remain active until further notice.

Week of November 18th , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

Week of November 25th , 2019 

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

10/18/2019: 2 Week Look Ahead

Week of October 21st , 2019

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

Week of October 28th , 2019

  • Continue to furnish and install drainage
  • Continue clearing and grubbing
  • Construction layout and establish grade for road reconstruction
  • Installation of sediment and erosion control devices to continue

10/04/2019: 2 Week Look Ahead

Week of October 7th , 2019 

  • Construction and detour are scheduled to resume on Monday, October 7th
  • Tree removal to continue
  • Construction layout to establish grade line
  • Installation of sediment and erosion control devices

Week of October 14th , 2019 

  • Tree removal to continue
  • Construction layout to establish grade line
  • Installation of sediment and erosion control devices

10/2/19: STROBEL ROAD UPDATE

Strobel Road construction is expected to resume the week of October 7, 2019.

--------------------------------------------------------

Detour for Strobel Road Reconstruction

The contractor will close lower Strobel Road from Gray Rock Road to Booth Hill Road, Monday through Friday, from 8:30 AM to 4:30 PM until further notice.

The roadway will be open to traffic Monday through Friday after 4:30PM and on the weekends.  During the time of construction, emergency vehicles and school buses will be allowed through at all times.

School buses will pick up and drop off students at their respective bus stops.

A detour for this area for all vehicular traffic, other than emergency vehicles and school buses, will be in effect from 8:30 AM to 4:30 PM, Monday through Friday. The detour is as follows:

Booth Hill Road to Pilgrim Lane to Beacon Hill Road to Stoneleigh Road to Gray Rock Road to Strobel Road and the reverse.

For residents travelling North on Pinewood Trail, the detour will start at Bear Den Road to Hemlock Trail.

Detour for Strobel Road Reconstruction

Detour signs will be posted to assist drivers in this area.

Please visit the Town and the Board of Education websites for additional information and updates about this project.

Thank you.

9/27/2019: 2 Week Look Ahead

Week of September 30th , 2019

An unforeseen issue has arisen and is currently being addressed. Construction is expected to resume shortly. An updated schedule will be provided this week.

9/27/19: Strobel Road Update

Strobel Road construction is expected to resume the week of October 7, 2019.

--------------------------------------------------------

Detour for Strobel Road Reconstruction

Important information from First Selectman Tesoro about the Strobel Road construction project:

This project was scheduled to begin this Thursday, August 29, 2019. As that is the first day of school, I have delayed the start of the project to next Tuesday, September 3rd at 7AM. You may see some minor construction activity over the next 2 days, but there will be no road closures or detours until next Tuesday.

Beginning on September 3rd, the contractor will close lower Strobel Road from Gray Rock Road to Booth Hill Road, Monday through Friday, from 8:30 AM to 4:30 PM until further notice.

The roadway will be open to traffic Monday through Friday after 4:30PM and on the weekends.

During the time of construction, emergency vehicles and school buses will be allowed through at all times.

School buses will pick up and drop off students at their respective bus stops.

A detour for this area for all vehicular traffic, other than emergency vehicles and school buses, will be in effect from 8:30 AM to 4:30 PM, Monday through Friday. The detour is as follows:

Booth Hill Road to Pilgrim Lane to Beacon Hill Road to Stoneleigh Road to Gray Rock Road to Strobel Road and the reverse.

For residents travelling North on Pinewood Trail, the detour will start at Bear Den Road to Hemlock Trail.

Detour for Strobel Road Reconstruction

Detour signs will be posted to assist drivers in this area.

Please visit the Town and the Board of Education websites for additional information and updates about this project.

Thank you.

9/19/19: Strobel Road Update

A minor, unforeseen issue has arisen and is being addressed. Construction will resume shortly.  An update will be provided on the town website when construction resumes. Thank you for your continued patience.

--------------------------------------------------------

Detour for Strobel Road Reconstruction

Important information from First Selectman Tesoro about the Strobel Road construction project:

This project was scheduled to begin this Thursday, August 29, 2019. As that is the first day of school, I have delayed the start of the project to next Tuesday, September 3rd at 7AM. You may see some minor construction activity over the next 2 days, but there will be no road closures or detours until next Tuesday.

Beginning on September 3rd, the contractor will close lower Strobel Road from Gray Rock Road to Booth Hill Road, Monday through Friday, from 8:30 AM to 4:30 PM until further notice.

The roadway will be open to traffic Monday through Friday after 4:30PM and on the weekends.

During the time of construction, emergency vehicles and school buses will be allowed through at all times.

School buses will pick up and drop off students at their respective bus stops.

A detour for this area for all vehicular traffic, other than emergency vehicles and school buses, will be in effect from 8:30 AM to 4:30 PM, Monday through Friday. The detour is as follows:

Booth Hill Road to Pilgrim Lane to Beacon Hill Road to Stoneleigh Road to Gray Rock Road to Strobel Road and the reverse.

For residents travelling North on Pinewood Trail, the detour will start at Bear Den Road to Hemlock Trail.

Detour for Strobel Road Reconstruction

Detour signs will be posted to assist drivers in this area.

Please visit the Town and the Board of Education websites for additional information and updates about this project.

Thank you.